This paper is published in Volume-2, Issue-6, 2016
Area
Operations Research
Author
K. Usha Madhuri, K. Chandan
Org/Univ
Sanketika Institute of Technology and Management (SITAM), Visakhapatnam, India
Keywords
Project network; Trapezoidal fuzzy number; Critical path, Linear Programming.
Citations
IEEE
K. Usha Madhuri, K. Chandan. Applying the Fuzzy Critical Path Method to Manufacturing Tugboat, International Journal of Advance Research, Ideas and Innovations in Technology, www.IJARIIT.com.
APA
K. Usha Madhuri, K. Chandan (2016). Applying the Fuzzy Critical Path Method to Manufacturing Tugboat. International Journal of Advance Research, Ideas and Innovations in Technology, 2(6) www.IJARIIT.com.
MLA
K. Usha Madhuri, K. Chandan. "Applying the Fuzzy Critical Path Method to Manufacturing Tugboat." International Journal of Advance Research, Ideas and Innovations in Technology 2.6 (2016). www.IJARIIT.com.
K. Usha Madhuri, K. Chandan. Applying the Fuzzy Critical Path Method to Manufacturing Tugboat, International Journal of Advance Research, Ideas and Innovations in Technology, www.IJARIIT.com.
APA
K. Usha Madhuri, K. Chandan (2016). Applying the Fuzzy Critical Path Method to Manufacturing Tugboat. International Journal of Advance Research, Ideas and Innovations in Technology, 2(6) www.IJARIIT.com.
MLA
K. Usha Madhuri, K. Chandan. "Applying the Fuzzy Critical Path Method to Manufacturing Tugboat." International Journal of Advance Research, Ideas and Innovations in Technology 2.6 (2016). www.IJARIIT.com.
Abstract
The critical path method is used to date in production operations whose outputs are relatively large complex end items such as highways, buildings, and ships. This paper considers Fuzzy Mathematical Model to find fuzzy critical path, fuzzy project duration in the network. All the activities in the network are represented by trapezoidal fuzzy numbers. Linear programming model is applied to find fuzzy critical path and fuzzy project duration in manufacturing Tugboat (Tugboat is a small ship that exercises vessels by pushing or towing). Finally practical applications shown with comparison.