Planning, Scheduling, Organizing, Cost, Material, and Quantity

Citationsacebook

IEEE
Aldrin. Planning and scheduling for multi-story building using M.S project, International Journal of Advance Research, Ideas and Innovations in Technology, www.IJARIIT.com.

APA
Aldrin (2021). Planning and scheduling for multi-story building using M.S project. International Journal of Advance Research, Ideas and Innovations in Technology, 7(2) www.IJARIIT.com.

MLA
Aldrin. "Planning and scheduling for multi-story building using M.S project." International Journal of Advance Research, Ideas and Innovations in Technology 7.2 (2021). www.IJARIIT.com.

Abstract

Every one of us is a manager of projects of our own life. From an employee to financial analyst, from banker to doctor, from engineer to administrator, from a teacher to a student, we all work on different tasks with deadlines. For managing the events or activity, there is computer-based software which is particularly design for the planning and secluding. Software like M.S Excel, M.S Project, and Primavera. This thesis is carried out for the planning and scheduling of the M.S project. To know that this type of software is easy and efficient than manual methods. This software is basically based on manual methods but it is less time-consuming and precise than manual methods. In this thesis construction, site planning and scheduling should be generated. The site name is Indraprastha greens it is a multistorey building project of 10 blocks of 7 story. Each story has 4 flats, there are two types of flats each flat has 5 blocks. The project is constructed by a DEEP GROUP OF COMPANYS. In this thesis, E-block is select for the research of planning and scheduling in the Microsoft Project. From excavation to finishing work schedule should be generated in the Microsoft project and notify the critical path. Resource allocation of every work and material should be provided. The cost of the work and material should be calculated in the M.S project. From this thesis, the positive outcome of the planning and scheduling should specify. This thesis is actually researching and notifying the proper planning and secluding for the management of the project with Microsoft project and it will notify the duration, deadline, cost, and material.