This paper is published in Volume-7, Issue-4, 2021
Area
Civil Engineering
Author
Sufiyan Hidayat Khan, Rohit Vasudev Lassi, Om Rajesh Dhonnar, Bhushan Umesh Alhat, Nyra Hiren Narang
Org/Univ
Vivekanand Education Society's Polytechnic College, Mumbai, Maharashtra, India
Pub. Date
24 August, 2021
Paper ID
V7I4-1833
Publisher
Keywords
Estimating, Spreadsheet, Rate Analysis

Citationsacebook

IEEE
Sufiyan Hidayat Khan, Rohit Vasudev Lassi, Om Rajesh Dhonnar, Bhushan Umesh Alhat, Nyra Hiren Narang. Estimation of public building (office building) in Google spreadsheet, International Journal of Advance Research, Ideas and Innovations in Technology, www.IJARIIT.com.

APA
Sufiyan Hidayat Khan, Rohit Vasudev Lassi, Om Rajesh Dhonnar, Bhushan Umesh Alhat, Nyra Hiren Narang (2021). Estimation of public building (office building) in Google spreadsheet. International Journal of Advance Research, Ideas and Innovations in Technology, 7(4) www.IJARIIT.com.

MLA
Sufiyan Hidayat Khan, Rohit Vasudev Lassi, Om Rajesh Dhonnar, Bhushan Umesh Alhat, Nyra Hiren Narang. "Estimation of public building (office building) in Google spreadsheet." International Journal of Advance Research, Ideas and Innovations in Technology 7.4 (2021). www.IJARIIT.com.

Abstract

Traditionally, estimating meant using Microsoft Excel to create a spreadsheet on your desktop or server. With the rise of cloud-based tools, today you might use Excel online, which allows you to collaborate with others in an online spreadsheet or Google Sheets which is a similar online tool. Which version you choose will likely depend on your company setup and whether you use Outlook (Microsoft) or Gmail (Google) for your general company email and functions. If you do happen to find any mistakes you can simply go back and edit the drawings and reprocess your file. About estimating, it is done to find out quantity of materials required for a particular project, also rate analysis if done for the same work which needs to be done. Rate analysis includes finding out cost of materials, labours with extra charges which are included in further chapters. The plans is made using AutoCAD, which are given at the end of project in appendix. This plans were made and estimation was done of the building in plan